Hot Sale for Meeting Rail Weatherstrip - aluminum window seal brush replacing pile window weather stripping – JYD

  • HOME
  • PRODUCTS
  • Hot Sale for Meeting Rail Weatherstrip - aluminum window seal brush replacing pile window weather stripping – JYD

Hot Sale for Meeting Rail Weatherstrip - aluminum window seal brush replacing pile window weather stripping – JYD

Short Description:


Product Detail

Company Information

Why choose us

Our service

Packaging & Shipping

RFQ

Product Tags

Related Video

Feedback (2)

To continuously increase the administration process by virtue of the rule of "sincerely, good religion and excellent are the base of company development", we commonly absorb the essence of linked goods internationally, and continually build new solutions to fulfill the requires of shoppers for Silicone Rubber Strip, Easierliver Home, Exterior Door Weatherstripping Types, To learn more about what we can do for you, contact us at any time. We look forward to establishing good and long-term business relationships with you.
Hot Sale for Meeting Rail Weatherstrip - aluminum window seal brush replacing pile window weather stripping – JYD Detail:

photobank (11)

Application :

Can used carbon steel, stainless steel, copper, aluminum and other pipes and profiles, such as: the tube, pipe, oval pipe, rectangular pipe, H-beam, I-beam, angle, channel, etc.

 

Manufacturer Jiayueda building matrials
Item Weight 6-8kg/roll
Size  7*6 mm
Suitable gap  Suitable for 3-5mm gap
Color Gray,black,white,brown
Item Package Quantity 200-500meters/roll,4rolls/carton
Included Components Puffing Weatherstripping
Batteries Included No
Batteries Required? No
Warranty Description 3-5 years

Package size:54*28*44cm,Neutral carton packaging ,package logo can be customers

Product Warranty: For warranty information about this product

 

Packaging & Shipping

Packaging Details:Packing by paper carton , roller packing by plastic bag, then put in carton
                     4 rolls/carton, 250 meters/roll
Port:SHENZHEN SHANGHAI GUANGZHOU

Single package size: 54*28*42 cm

Single gross weight:5-8kg
 photobank (9)

Product detail pictures:

Hot Sale for Meeting Rail Weatherstrip - aluminum window seal brush replacing pile window weather stripping – JYD detail pictures

Hot Sale for Meeting Rail Weatherstrip - aluminum window seal brush replacing pile window weather stripping – JYD detail pictures

Hot Sale for Meeting Rail Weatherstrip - aluminum window seal brush replacing pile window weather stripping – JYD detail pictures

Hot Sale for Meeting Rail Weatherstrip - aluminum window seal brush replacing pile window weather stripping – JYD detail pictures


Related Product Guide:

Our products are greatly recognized and trustworthy by users and will fulfill continually shifting economic and social requires for Hot Sale for Meeting Rail Weatherstrip - aluminum window seal brush replacing pile window weather stripping – JYD , The product will supply to all over the world, such as: Costa rica, kazan, California, With high quality, reasonable price, on-time delivery and customized & customized services to help customers achieve their goals successfully, our company has got praise in both domestic and foreign markets. Buyers are welcome to contact us.

photobank (3) 

We are proffecinal manufacturer of door  and window  weather strip,we can provide best price and good quality ,we have four factories can delivery at time

photobank (32)

Our service

1. Free sample.

2. Online consultation.

After-sales:

1. Installation instructions.

2.The shelf life of non silicified weather strip is 1-3 years without unpacking and 1 year after unpacking;

The shelf life of silicified weather strip is 3-5 years without unpacking and 2 years after unpacking.

3.Your question will be answered in 2 hours.

Packaging Details:Packing by paper carton , roller packing by plastic bag, then put in carton
                     4 rolls/carton, 250 meters/roll
Port:SHENZHEN SHANGHAI GUANGZHOU

Single package size: 54*28*42 cm

Single gross weight:5-8kg
 photobank (9)

Q: Are you a trading company or manufacturer?
A: We are a factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock,it is according to quantity.

Q: Do you provide samples? is it free or extra ?
A: Yes, it is free.

Q: How can you guarantee the quality?

A:Experienced team of engineers and strict quality control. If you meet with quality problem,

we promise to replace goods or return your funds. Products are approved by SGS,ISO9001.

Q: I don’t find I want, can you OEM to me? What about minimum order quantity?

A:Yes, we are a professional OEM manufacturer more than 20 years’ experience, we have a large supper ability, but we never refuse to small orders, the MOQ can be 5000 meters.

  • This enterprise in the industry is strong and competitive, advancing with the times and develop sustainable, we are very pleased to have a opportunity to cooperate!
    5 Stars By Marcy Real from Nepal - 2018.11.04 10:32
    Wide range, good quality, reasonable prices and good service, advanced equipment, excellent talents and continuously strengthened technology forces,a nice business partner.
    5 Stars By David from Ukraine - 2018.05.13 17:00